About this Project

Work description – Concealed fix Trespa High Pressure Laminate cladding, Aluminium trims and profiles and Ideal Combi Composite windows installed to a Metsec Metframe building.

Comment – The choice of Ideal Combi’s pre-glazed window units made the installation fairly simple but manufacturing and positioning the aluminium recessed channel sections between the Trespa panels involved detailed and complex Design and setting out on site.

B R Hodgson (Holdings) Limited Location: London Contractor: McLaren Construction Sub-contract Value: £35M Sub-contract Period: 35 Weeks