Internal metal stud, external linings and suspended ceilings and lead lining to x-ray rooms.

A close working partnership approach was taken with Laing O’Rourke which enabled detailed programming with the client and other trades allowing the works to progress in a logical sequence and to an achievable productive disciplined programme. Lafarge systems were installed and adapted to suit ‘value’ and specific detailing. A full recycling process was carried out for plasterboard waste and metal stud off cuts.

← Back to Drywall

B R Hodgson Limited Location: Minehead Contractor: Laing O’Rourke Sub-contract Value: £1M Sub-contract Period: 52 Weeks