Case Study: Nurse’s Accommodation
About this Project
The framing system to 3 five storey buildings was completed within a 16-week period which included placing of the prefabricated shower pods within each of the 160 bedrooms.
← Back to MetframeB R Hodgson Framing Ltd Location: West Suffolk Hospital Contractor: Barnes Construction Sub-contract Value: £1.5 Million Sub-contract Period: 16 weeks