Case Study: The Arch
About this Project
Curved Metsec SFS Framing and Sto Insulated Render to external envelope of apartment building.
Fairly standard curved metsec and render project, although BRH helped with significant value engineering options to help reduce the overall cost of the envelope.
B R Hodgson (Holdings) Limited Location: London Contractor: Jerram Falkus Constructions Sub-contract Value: £230k Sub-contract Period: 20 Weeks